F2b: Establish Titus Towers Creek Shared-Use Path
Create safe passageway from Meadow St to Plain St along Titus Towers property and NYSEG utility corridor
D3: Build State St Protected Bike Lane (Floral Ave to Meadow St)
Upgrade existing bike lane to a protected or raised bike lane due to heavy traffic flows
E1: Build Cecil Malone Shared-Use Path
Build bridge over flood control channel, and extend existing wide sidewalk near Nate’s Floral Estates to new bridge and Wegmans
E2: Formalize Lehigh Valley Shared-Use Path
Formalize shortcut and link to rehabilitated bridge
B5: Paint Court St Bike Lane (Fulton St to University Ave)
Paint bike lane connecting Cayuga Waterfront Trail to University Ave uphill bike lane for confident bicycle users
C4: Build Meadow St Shared-Use Path (Third St to Cecil Malone Dr)
Test allowing bicycling on Meadow and Fulton Street sidewalks
A8: Build University Ave Uphill Bike Lane
Implement changes planned by the City of Ithaca in 2018
F1: Repave Plain and Wood St. Bike Boulevards
Repave bike boulevards to provide a safe riding surface
F2a: Fairgrounds Memorial Protected Bike Lane
Build two-way cycle track from Walmart to Meadow St. using one lane.
F3: Build Elmira Rd Protected Bike Lane to Spencer Rd
Upgrade bike lanes on Elmira Road to protected bike lanes or two-way cycle track from Plain St. to S Meadow St. Continue protected lanes across crosswalk at Meadow St., onto existing parklet by gas station, and to Meadow St.