F2a: Fairgrounds Memorial Protected Bike Lane
Build two-way cycle track from Walmart to Meadow St. using one lane.
B3: Cascadilla Street Protected Bike Lane
Pilot test a two-way protected bike lane on north side of Cascadilla St from Cayuga St to the new Greenstar, keeping in mind complex turning needs at Cayuga St and Northside-Southside route intersections.
D2: Redesign & Add Wayfinding to Foot-of-West-Hill Bike Facilities
Simplify and make safer connections between W MLK Jr and Hector St bike lanes to CWT, BDT extension, and potential Elm St bike lane (Project D1). Add wayfinding signage to make these connections even more visible.
F3: Build Elmira Rd Protected Bike Lane to Spencer Rd
Upgrade bike lanes on Elmira Road to protected bike lanes or two-way cycle track from Plain St. to S Meadow St. Continue protected lanes across crosswalk at Meadow St., onto existing parklet by gas station, and to Meadow St.
E5: Build Six Mile Creek Trail (Plain St to Cayuga St)
Add diverters to encourage vehicles to use Albany and Cayuga Streets for thru-traffic. Create 11+ foot wide shared-use trail along creekside.
D4: Build State St Protected Bike Lane (Meadow St to Downtown)
Connect Downtown to West End with protected lanes or two-way cycle track. Remove double-yellow line and use parked vehicles to buffer bike lanes.
D5: Study & Pilot Test Downtown Ithaca Bike Circulation
Conduct a study focused on connecting the Fall Creeker, Waterfront Connector, Hill-to-Hill, and Six Mile Creek Trail together on existing downtown streets. Pilot test allowing slow bicycling (10 mph or less) along center of the Commons.