D1: Conduct Feasibility Study of Elm Street Bike Lanes
Conduct study to determine how to serve southern West Hill residential areas with bike infrastructure, in particular West Village Apartments.
F5: Build Access Paths Between Rt 13 and Spencer Rd
Create shared-use paths connecting Spencer Rd to Rt 13 every 800 feet (two city blocks); use vacant lots next to Honda and U-Haul property
F2b: Establish Titus Towers Creek Shared-Use Path
Create safe passageway from Meadow St to Plain St along Titus Towers property and NYSEG utility corridor
D3: Build State St Protected Bike Lane (Floral Ave to Meadow St)
Upgrade existing bike lane to a protected or raised bike lane due to heavy traffic flows
B4. Construct Cascadilla, Court St Railroad Crossings
Expand public access to Cayuga Waterfront Trail by building a bike/ped railroad crossing at Cascadilla St and formalizing the crossing at Court St.
B2: Build Third Street Protected Bike Lane
Pilot test protected bike lane from Cascadilla St to CWT trailhead at the Ithaca Farmers Market to increase safety during peak hours and market days.
E6: Extend Cayuga St Protected Bike Lane to Chainworks
Extent Cayuga St protected bike lanes from downtown to connect separate portions of Six Mile Creek trail and the Chainworks redevelopment.
E1: Build Cecil Malone Shared-Use Path
Build bridge over flood control channel, and extend existing wide sidewalk near Nate’s Floral Estates to new bridge and Wegmans
E2: Formalize Lehigh Valley Shared-Use Path
Formalize shortcut and link to rehabilitated bridge
B5: Paint Court St Bike Lane (Fulton St to University Ave)
Paint bike lane connecting Cayuga Waterfront Trail to University Ave uphill bike lane for confident bicycle users
C4: Build Meadow St Shared-Use Path (Third St to Cecil Malone Dr)
Test allowing bicycling on Meadow and Fulton Street sidewalks
A8: Build University Ave Uphill Bike Lane
Implement changes planned by the City of Ithaca in 2018
A5: Paint Falls, Lincoln St Bike Lanes
Paint bike lanes to provide safer access from the Tioga St Bike Blvd to Ithaca Falls, Ithaca High School, and the Farmers Market (via the CWT).
A4: Extend Cayuga St Protected Bike Lane (Lincoln St to Downtown)
Protect existing bike lanes or combine into two-way cycle track on northbound side.
F4b: Establish Buttermilk Falls Shared-Use Entryway
Widen and pave existing footpath from Spencer Rd to Buttermilk Falls State Park parking lot, complete with signage
E3: Build Six Mile Creek Trail (Wegmans to Plain St)
Connect Wegmans driveway to S Plain St with protected bike lane or shared use trail. Improve safety by adding signal priority and diverter at Meadow St. Repave parts of S Plain St.